Hello,
On a 2015 Genesis 3.8L V6, how do I reset the ECU or learned transmission values? I learned that it could be done by disconnecting the negative on the battery.
Can you guide me on the exact steps? and what kind of procedure do I have to do after the reset (e.g., switch car on for how many seconds, turn engine on, let it idle, then drive....etc).
Let me know guys,
Thanks a bunch!
- Husam
On a 2015 Genesis 3.8L V6, how do I reset the ECU or learned transmission values? I learned that it could be done by disconnecting the negative on the battery.
Can you guide me on the exact steps? and what kind of procedure do I have to do after the reset (e.g., switch car on for how many seconds, turn engine on, let it idle, then drive....etc).
Let me know guys,
Thanks a bunch!
- Husam

